Showing posts with label 2013 FAL. Show all posts
Showing posts with label 2013 FAL. Show all posts

Friday, October 18, 2013

I.S.T.H Finished - First for the Q4 FAL


This is my first finish for the fourth quarter of the Finish-A-Long.  You can see my finish list here. I decided to start with a project that was mostly finished to give me a kick start to the quarter.
For this one all I had left was to finish the quilting in the purple border and the yellow in the stars. I decided to leave the curves in the light purple fabric as they were.  The original hold up for this project was trying to decide if I wanted to add feathers to those curves.  I decided to keep the quilt soft and not put in the feathers. Once the rest of the quilting was done, binding it was quick.


While I was taking photos, some of the ducks at the park kept getting closer.
They seemed really interested in what we were doing.  

 
Or perhaps they thought we had food.




I sure love my quilt holders. This holder is my youngest son.
He is the perfect height to hold this one up. 

One finish complete, that leaves 11 more for the quarter.
I'm fired up to get these finishes knocked out, some have been waiting a long time.
Lets hope that fire doesn't die out after the first month.



=^..^=

Saturday, October 12, 2013

Finish Along 2013 Fourth Quarter

I am a little late to the party, but better late than never right?  I have decided to join the last quarter of the Finish Along for 2013.  I will finally have some more quilting time for myself this fall since I am only enrolled in one college class.  Next spring I take three more classes and then I will have my bachelor's degree. YAY!!

 Leanne, the host this year, said go large so that is what I plan to do!  I am going to aim for four finishes per month. That's doable right?? So without further delay I will list the finishes that I want to get done this quarter.

1. Quilt and bind my HST Christmas Quilt



2. Quilt and bind my Starry Night Christmas Quilt


3. Quilt and bind my Pinwheel Christmas Quilt


4. Sew together a fourth Christmas quilt from these strips I cut out last year.
I am going to add an off white fabric and make a strip tube Christmas Quilt.

Can you tell I want to be ready for Christmas this year??



5.  Finish quilting my i.s.t.h. quilt.  I am almost done with the quilting.  The hold up on this on has been me trying to decide if I wanted to add more feathers to a curved lined I quilted in the large triangle sections.  



6.  Finish the top for my twisting maple leaf quilt.


7.  Quilt and bind my Slide Show Quilt


8. Finish my Dresden quilt.  I am so close to having this one be a complete top.


9. Make that last Mondo bag which I bought the interfacing for.


10.  Quilt my Leap Year Schnibbles quilt


11. Quilt my Jacks Schnibbles Quilt


12.  Finally finish the quilting on this Pinwheel quilt.
Out of all the projects on the list, this one has been waiting the longest.


Phew, that is a lot of quilting.  Let's see if I can get them all done. There is no penalty for not finishing everything on the list, so it is good to make a long list.  It also helps put things in a time line for me.  If I have 12 things that I know I want to finish these next three months, I won't waste time trying to figure out which ones should get done first.  I love this list! I wish I would have jumped into this Finish Along sooner.

=^..^=