This is my UFO list for the second quarter of the 2014 Finish A-Long.
The original blog post can be found here.
This quarter I have decided to continue to have a list with 12 items to work on. So far I have managed to only get half of the list done each time I participate, but I like having the option of 12 different projects to choose from, so I will be listing twelve more UFOs for this quarter: the six from last month that didn't get done, and six new ones.
July 6th is the last day to link up finishes.
The original blog post can be found here.
This quarter I have decided to continue to have a list with 12 items to work on. So far I have managed to only get half of the list done each time I participate, but I like having the option of 12 different projects to choose from, so I will be listing twelve more UFOs for this quarter: the six from last month that didn't get done, and six new ones.
July 6th is the last day to link up finishes.
This one sat by the sewing machine all quarter. I stared at it a lot, but never picked it up, except to move it from one corner of the table to the other. | |
Made some good progress on these.
Got all my outer bags sewn together and my inner bags ironed onto the fusible fleece. | |
tops. Didn't even pull it out of the drawer this quarter. | |
No progress at all on this one.
| |
projects. That is all I did with it this quarter. | |
Still sitting by the machine.
Untouched. | |
tops. Didn't even pull it out of the drawer this quarter. | |
the other tops, untouched. | |
I did pull this one out and
contemplated if I wanted to add the orange fabric I bought for the border. Then I put it back in the drawer. |
No comments:
Post a Comment